Rudick served as CMAR for the Lafayette Parish School board constructing this two-story new 20 classroom wing addition tied into an existing active school. The addition’s structural materials are primarily comprised of CMU block with steel joist and a composite deck with brick veneer, and a mod bit roofing system. Construction of the new addition took place as school was in session and required careful coordination between the General Contractor, Sub-contractors, and school administration to execute ongoing studies in the least disruptive fashion, an area Rudick consistently excels above the competition.